OpenField
United Kingdom · Internship · Reviewed 2026-10-15

Port of Tyne & Offshore Renewable Energy Catapult Engineering Internship

Six-to-twelve month placement at the Blyth offshore testing facility evaluating blade aerodynamics, turbine foundation fatigue, and subsea cable dynamics for North Sea wind farms.

Official university details ↗Research checked, not sponsored

Application checklist & requirements

These requirements reflect published university guidelines available at the last review. Review official department guidelines before submission.

Academic degree / Prerequisites
Enrolled in MEng Marine Engineering, Renewable Energy, or Mechanical Engineering with 2:1 standing
English language proficiency
Fluent English proficiency
Standardized testing (GRE/GMAT)
Not required
Thesis / Research statement
Technical CV and portfolio of hydrodynamic or CAD simulations
Recommendation letters
Degree program tutor endorsement

How much will it cost? How much funding is available?

Financial support / stipend
GBP 21,500 per annum pro-rata industrial placement salary
Application fee
GBP 0
Tuition / joining costs
Placement year fee (GBP 1,850)

Dates and verification

Application deadline
February 15, 2027 (Summer 2027 placement)
Last source review
2026-10-15

Important verification note

Facts reflect official Newcastle University documentation reviewed 2026-10-15. Admissions, funding allocations, and eligibility thresholds are evaluated by the university.

Reviewed 2026-10-15 · Editorial standards · Report an issue